BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

男人扒开添女人下部免费视频| 四虎影视久久久免费| 国产freesexvideos中国麻豆| 亚洲精品乱码久久久久久不卡 | 全免费a级毛片免费看视频| 无码中文字幕日韩专区| 女人自熨全过程直播| 久久婷婷色综合一区二区| 粉嫩虎白女毛片人体 | 麻麻张开腿让我爽了一夜| 亚洲av无码一区二区三区天堂| 国产麻豆一精品一av一免费| 久久亚洲欧美国产精品| 天天弄天天模| 在熟睡夫面前侵犯我在线播放| 日本一区二区三区免费播放 | 高h小月被几个老头调教| 品色堂永远的免费论坛| 蜜桃精品成人影片| 不卡av电影在线| 四虎国产精品永久在线| 富婆如狼似虎找黑人老外| 国产激情久久久久影院老熟女| 中国丰满熟妇xxxx性| 99久久精品国产一区二区蜜芽| 精品一二三区久久aaa片| 午夜男女爽爽爽在线视频| 久久久国产精品无码免费专区| 亚洲女同一区二区| 麻豆国产av超爽剧情系列| 亚洲国产精品无码久久一区二区| 国产人碰人摸人爱视频 | 亚洲三区在线观看无套内射| 国产精品免费看久久久无码| 人人做人人爽人人爱| 麻豆一区二区三区精品视频| 曰韩无码无遮挡a级毛片| 欧美日韩精品一区二区在线视频 | а中文在线天堂| 中文字幕在线亚洲精品| 超碰人人超碰人人|