国产av无码专区亚洲av男同,激情人妻另类人妻伦,久久精品这里热有精品,女人高潮特级毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

无码人妻黑人中文字幕| 精品人妻无码一区二区色欲产成人| 国产精品jizz在线观看老狼| 欧美亚洲精品suv| 黑人上司好猛我好爽中文字幕| 久久午夜无码鲁丝片直播午夜精品 | 午夜成人理论福利片| 性色av无码一区二区三区人妻| 欧洲精品免费一区二区三区| 国产人久久人人人人爽| 国产午夜福利精品一区二区三区| 久久久精品中文字幕麻豆发布| 一本色道久久88加勒比—综合| 色婷婷综合久久久久中文字幕| av蓝导航精品导航| 色婷婷综合久久久久中文字幕| 国产成人综合在线视频| 亚洲av无码国产一区二区| 中文字幕人成乱码熟女| 欧美gv在线观看| 国产色xx群视频射精| 红桃av一区二区三区在线无码av | 国产成人综合在线视频| 女人18毛片a级毛片| 日本在线视频www色| 少妇人妻偷人精品无码视频新浪| 亚洲欧美日韩中文无线码| 伊人久久大香线蕉综合影院首页| 风流老熟女一区二区三区| 男女猛烈拍拍拍无挡视频| 曰韩无码二三区中文字幕| 四虎成人精品无码永久在线| 国产av一区二区三区| 波多野结衣中文字幕一区二区三区| 欧美大成色www永久网站婷| 99久久精品免费看国产一区二区三区 | 国产伦精品一区二区三区妓女| 夜夜躁狠狠躁2021| 国产69久久精品成人看| 和黑人邻居中文字幕在线| 人人摸人人操|